PDK Peachtree Dekalb Airport in Metro-Atlanta

SCOPE OF SERVICES

KEY Engineering Group, Inc. (KEY) provided modification of the runway designations for 2L-20R and 2R-20L to 3L-21R and 3R-21L respectively.

KEY designed and submit Detailed Construction Documents and specifications to cover all modifications associated with 2R-20L , 2L-20R as well as 9/27 and also all other signs currently not complying with the latest FAA Advisory circulars